Snagging
Under Project management in the menu.
Track defects, loose ends and completion issues through to verification, each snag aligned to its room, element, phase and job.
Methodology: Snagging is a controlled close-out list. Each snag records where it is (room and building element) and what work it belongs to (phase and job), with severity, owner and status until verified — so the right contractor sees the right defect with no ambiguity about location.
Steps:
- Press Add snag: What's the defect?, Description, Room, Building element, Phase, Job and Severity (Low, Medium, High).
- Add evidence with the Photo and Video capture buttons.
- Under Alert the supplier pick Email, WhatsApp or SMS and tick Alert on save — the supplier with the accepted quote for that phase or job is offered.
- Move each snag Open → In progress → Fixed → Verified with the status select; click a row to Edit snag and Alert now. Snags can also be raised from On Site.