Setup Guide
Under Getting started in the menu. Open the page
The full-page setup guide: every step in three stages — Basics, Next steps, Final steps — with numbered instructions, ticking itself off as your data appears.
Methodology: The first project becomes the working template for future refurbishments, so setup should cover the main operating structure before detailed delivery work begins. The stages are a suggested order, not a gate — every page stays open throughout. The same steps drive the floating Setup guide panel; this page is the roomier version and the one place the panel can be brought back from after you close it.
Steps:
- Pick the property and project the guide should track.
- Work down Basics: your details, property, rooms, project, feasibility, phase dates and budgets, jobs and schedule.
- Move on to Next steps — suppliers, survey, quotes, payment schedules, plans, cash accounts, the portal — and Final steps for the professional records and settings.
- Follow each step's button; it opens the page that completes it. Steps the data cannot prove have a Mark as done button.
- Press Show floating guide if you closed the panel and want it back.